BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Steam and Boiler Plant

Assembly

The boiler and feedwater set that raise the saturated steam the autoclaves consume each cycle. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Steam and Boiler Plant parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Steam and Boiler Plant parts diagram: 1 steam boiler, 2 feedwater pump, 3 water treatment skid, 4 steam header, 5 boiler burner, 6 o-ring set. 7 parts in 6 top-level items.
Steam and Boiler Plant parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Steam Boiler 1× Steam boiler
2 Feedwater Pump 2× Feedwater pumps
3 Water Treatment Skid 1× Water treatment skid
4 Steam Header 1× Steam distribution header
5 Boiler Burner 1× Boiler burner
6 O-Ring Set 1× Pump and valve seals

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Steam and Boiler Plant

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Steam Boiler autoclaved-aerated-concrete-plant-boiler-unit 1× 1 · part
2 Feedwater Pump autoclaved-aerated-concrete-plant-feed-pump 2× 2 · part
3 Water Treatment Skid autoclaved-aerated-concrete-plant-water-treat 1× 1 · part
4 Steam Header autoclaved-aerated-concrete-plant-steam-header 1× 1 · part
5 Boiler Burner autoclaved-aerated-concrete-plant-burner 1× 1 · part
6 O-Ring Set oring-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the steam and boiler plant is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks