Formwork Table System

Product

Overview

A formwork table is a complete section of floor form built once and reused for every level of a building. It holds the wet concrete of a suspended slab until the slab cures, then it is lowered, rolled to the edge of the building, lifted by crane, and set on the floor above to cast the next slab. The point of building the form as a single large table rather than as loose timber and props is speed: one crane lift moves a whole bay of formwork in minutes, so a tower can turn a floor every few days. The system here is built around the Decking and Facing that the concrete sits on, the Primary Beam Grid and Secondary Joist Layer that carry that deck, the Telescopic Props and Legs that stand it on the slab below, and the Drophead Mechanism, Flying Trolley, and Lifting and Fork Points gear that let it be struck and flown without taking it apart. The Edge Protection and Bracing and Alignment keep crews safe on the table and hold it square while it travels.

Deck and facing

The slab is cast on the Decking and Facing. Its working face is a layer of Phenolic Plywood Sheet panels, birch plywood faced both sides with a hard phenolic film that gives a smooth soffit and survives a great many pours. A Release Facing Coat of film and release agent lets the cured slab strip clean off the plywood without tearing the face. Round the perimeter a Edge Rail stiffens the panel and locates the side form, and where one table meets a wall or the next table a Infill Strip closes the gap so the finished soffit runs flat across the joint. The plywood is held down with countersunk Deck Screw fixings driven from above, which keeps the slab face clean and lets a damaged sheet be swapped quickly.

Beams and joists

The deck cannot span far on its own, so it sits on two layers of beam. The Secondary Joist Layer are the close-spaced upper layer: rows of H20 Timber Joist timber I-beams laid every 300 to 500 mm and held down by Joist Clip clips so they do not shift while the table is flown. A Joist Spacer Comb comb fixes the joist centres, and a Joist End Cap protects each timber end. Below the joists run the Primary Beam Grid: deep aluminium Primary Girder sections that gather the joist loads and carry them to the props. Girders are made up to length with bolted Girder Splice Plate plates, clamped to the prop heads with a Beam Clamp at each bearing, and stiffened with a Web Stiffener where the prop reaction is highest.

Props and height setting

The Telescopic Props and Legs stand the table on the slab cast below it. Each Telescopic Prop Leg is a two-tube telescopic leg: the Inner Prop Tube slides inside the Outer Prop Tube to a coarse height set by a Adjustment Pin and held by a Locking Collar. Fine height comes from a Screw Jack at the leg top, where the operator turns the Jack Nut on the Jack Spindle to trim the slab level to a few millimetres. The leg sits on a Base Plate that spreads the load onto the slab, and a Prop Head seats the girder. Setting the props is what fixes the soffit level, so a Level Indicator on the frame is read before the jacks are locked.

Striking, flying, and lifting

Once the slab has cured enough to hold itself, the table must come down. The Drophead Mechanism lets that happen without dropping the props: knocking out the Release Wedge lets the Drophead Body lower the deck by the Stroke Stop travel, around 100 to 150 mm, which is enough to break the deck free of the slab while the legs still stand. With the deck dropped, the Flying Trolley takes over. A Trolley Jack lifts the table off its props onto the Trolley Frame, which rolls on heavy Swivel Castor wheels along a Roller Track to the slab edge. There the table runs out over a Edge Roller until its Fork Pocket sections clear the building, and the Crane Lifting Fork on the crane slides in and flies the table up to the next floor. Where a fork cannot reach, a Sling Chain hooked to the Lifting Eye points through a Shackle takes the lift instead.

Materials and safety

The table mixes materials to keep weight down where it can. The girders are aluminium for a high strength-to-weight ratio, the joists are timber I-beams that are light and easy to cut on site, and the props, base plates, and lifting gear are steel for stiffness and abrasion resistance. While crews work on the table tying reinforcement, the Edge Protection guards the open edge: a Handrail Post in each Post Socket carries the Guard Rail rails, and a Toe Board stops tools falling onto the floor below. The whole table is held square by the Bracing and Alignment, where a Diagonal Brace clamped with a Brace Coupler stops it racking during the move and a Alignment Screw slides it into its exact set-out line. Reused this way for hundreds of pours, a set of these tables casts every floor of a building from one investment in formwork.

Formwork Table System parts and their functions

9 top-level parts · 449 parts in total · full bill of materials below
Formwork Table System parts diagram: 1 decking and facing, 2 primary beam grid, 3 secondary joist layer, 4 telescopic props and legs, 5 drophead mechanism, 6 flying trolley, 7 lifting and fork points, 8 edge protection, 9 bracing and alignment. 449 parts in 9 top-level items.
Formwork Table System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Decking and Facing 6 parts 1× Decking and facing
2 Primary Beam Grid 5 parts 1× Primary beam grid
3 Secondary Joist Layer 4 parts 1× Secondary joist layer
4 Telescopic Props and Legs 6 parts 1× Telescopic props and legs
5 Drophead Mechanism 5 parts 1× Drophead lowering mechanism
6 Flying Trolley 6 parts 1× Flying trolley and castors
7 Lifting and Fork Points 5 parts 1× Lifting and crane fork points
8 Edge Protection 5 parts 1× Edge protection and handrail
9 Bracing and Alignment 5 parts 1× Bracing and alignment hardware

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Formwork Table System

9 top-level lines · 66 rows shown · 449 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Decking and Facing 6 parts formwork-table-deck 1× 1 21 assembly
1.1 Phenolic Plywood Sheet formwork-table-plywood-sheet 6× 6 · part
1.2 Release Facing Coat formwork-table-facing-coat 1× 1 · part
1.3 Edge Rail formwork-table-edge-rail 4× 4 · part
1.4 Infill Strip formwork-table-infill-strip 8× 8 · part
1.5 Deck Screw formwork-table-deck-screw 1× 1 · part
1.6 Fastener Set fastener-set 1× 1 · part
2 Primary Beam Grid 5 parts formwork-table-primary-beams 1× 1 51 assembly
2.1 Primary Girder formwork-table-primary-girder 6× 6 · part
2.2 Girder Splice Plate formwork-table-girder-splice 8× 8 · part
2.3 Beam Clamp formwork-table-beam-clamp 24× 24 · part
2.4 Web Stiffener formwork-table-web-stiffener 12× 12 · part
2.5 Fastener Set fastener-set 1× 1 · part
3 Secondary Joist Layer 4 parts formwork-table-secondary-joists 1× 1 136 assembly
3.1 H20 Timber Joist formwork-table-h20-joist 28× 28 · part
3.2 Joist Clip formwork-table-joist-clip 56× 56 · part
3.3 Joist End Cap formwork-table-end-cap 28× 28 · part
3.4 Joist Spacer Comb formwork-table-joist-spacer 24× 24 · part
4 Telescopic Props and Legs 6 parts formwork-table-props 1× 1 88 assembly
4.1 Telescopic Prop Leg 3 parts formwork-table-prop-leg 8× 8 3 assembly
4.1.1 Outer Prop Tube formwork-table-outer-tube 1× 8 · part
4.1.2 Inner Prop Tube formwork-table-inner-tube 1× 8 · part
4.1.3 Adjustment Pin formwork-table-prop-pin 1× 8 · part
4.2 Screw Jack 3 parts formwork-table-screw-jack 8× 8 3 assembly
4.2.1 Jack Spindle formwork-table-jack-spindle 1× 8 · part
4.2.2 Jack Nut formwork-table-jack-nut 1× 8 · part
4.2.3 Ball Bearing ball-bearing 1× 8 · part
4.3 Base Plate formwork-table-base-plate 8× 8 · part
4.4 Prop Head formwork-table-prop-head 8× 8 · part
4.5 Adjustment Pin formwork-table-prop-pin 16× 16 · part
4.6 Locking Collar formwork-table-prop-collar 8× 8 · part
5 Drophead Mechanism 5 parts formwork-table-drophead 1× 1 20 assembly
5.1 Drophead Body formwork-table-drophead-body 4× 4 · part
5.2 Release Wedge formwork-table-drop-wedge 4× 4 · part
5.3 Stroke Stop formwork-table-drop-stroke-stop 4× 4 · part
5.4 Drophead Return Spring formwork-table-drop-spring 4× 4 · part
5.5 Coil Spring coil-spring 4× 4 · part
6 Flying Trolley 6 parts formwork-table-trolley 1× 1 37 assembly
6.1 Trolley Frame formwork-table-trolley-frame 1× 1 · part
6.2 Swivel Castor 4 parts formwork-table-castor 4× 4 5 assembly
6.2.1 Castor Wheel formwork-table-castor-wheel 1× 4 · part
6.2.2 Swivel Fork formwork-table-castor-fork 1× 4 · part
6.2.3 Castor Brake formwork-table-castor-brake 1× 4 · part
6.2.4 Ball Bearing ball-bearing 2× 8 · part
6.3 Trolley Jack formwork-table-trolley-jack 2× 2 · part
6.4 Roller Track formwork-table-roller-track 2× 2 · part
6.5 Edge Roller formwork-table-edge-roller 4× 4 · part
6.6 Ball Bearing ball-bearing 8× 8 · part
7 Lifting and Fork Points 5 parts formwork-table-lifting 1× 1 17 assembly
7.1 Crane Lifting Fork formwork-table-lifting-fork 1× 1 · part
7.2 Fork Pocket formwork-table-fork-pocket 4× 4 · part
7.3 Lifting Eye formwork-table-lift-eye 4× 4 · part
7.4 Sling Chain formwork-table-sling-chain 4× 4 · part
7.5 Shackle formwork-table-shackle 4× 4 · part
8 Edge Protection 5 parts formwork-table-edge-protection 1× 1 48 assembly
8.1 Handrail Post formwork-table-handrail-post 12× 12 · part
8.2 Guard Rail formwork-table-guard-rail 12× 12 · part
8.3 Toe Board formwork-table-toe-board 8× 8 · part
8.4 Post Socket formwork-table-post-socket 12× 12 · part
8.5 Sheet Metal Panel sheet-panel 4× 4 · part
9 Bracing and Alignment 5 parts formwork-table-bracing 1× 1 31 assembly
9.1 Diagonal Brace formwork-table-diagonal-brace 8× 8 · part
9.2 Brace Coupler formwork-table-brace-coupler 16× 16 · part
9.3 Alignment Screw formwork-table-align-screw 4× 4 · part
9.4 Level Indicator formwork-table-level-indicator 2× 2 · part
9.5 Fastener Set fastener-set 1× 1 · part

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $50–$10k. How estimates work
VendorHQSpecialtyMOQLead time
🇸🇪ASSA ABLOY
assaabloy.com ↗
Stockholm, SE Locks & access 1,000 units 8–12 wks
🇺🇸Allegion
allegion.com ↗
Dublin, US Security products (Schlage) 1,000 units 8–12 wks
🇨🇭dormakaba
dormakaba.com ↗
Rümlang, CH Access & door systems 1,000 units 8–12 wks
🇺🇸Honeywell
honeywell.com ↗
Charlotte, US Building & safety tech 1,000 units 8–12 wks
🇨🇳Hikvision
hikvision.com ↗
Hangzhou, CN Surveillance & security 1,000 units 8–12 wks

982-word article