Cake and Product Handling

Assembly

The cranes, separators, and packing line that move cakes through the plant and palletize the finished blocks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cake and Product Handling parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Cake and Product Handling parts diagram: 1 ferry cart, 2 product tilting crane, 3 block separator, 4 packing line, 5 pallet return, 6 drive belt. 7 parts in 6 top-level items.
Cake and Product Handling parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Ferry Cart 1× Ferry transfer cart
2 Product Tilting Crane 1× Product tilting crane
3 Block Separator 1× Block separator
4 Packing Line 1× Packing and strapping line
5 Pallet Return 1× Pallet return conveyor
6 Drive Belt 2× Conveyor belts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cake and Product Handling

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Ferry Cart autoclaved-aerated-concrete-plant-ferry-cart 1× 1 · part
2 Product Tilting Crane autoclaved-aerated-concrete-plant-tilt-crane 1× 1 · part
3 Block Separator autoclaved-aerated-concrete-plant-separator 1× 1 · part
4 Packing Line autoclaved-aerated-concrete-plant-packer 1× 1 · part
5 Pallet Return autoclaved-aerated-concrete-plant-pallet-return 1× 1 · part
6 Drive Belt drive-belt 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the cake and product handling is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks