BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Combustion Control System

Assembly

The PLC, thermocouples, and burner controls that hold the firing curve along the kiln length. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Combustion Control System parts and their functions

7 top-level parts · 90 parts in total · full bill of materials below
Combustion Control System parts diagram: 1 kiln PLC, 2 operator station, 3 thermocouple, 4 burner controller, 5 oxygen probe, 6 wire bundle, 7 connector. 90 parts in 7 top-level items.
Combustion Control System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Kiln PLC 4 parts 1× Kiln PLC
2 Operator Station 3 parts 1× Operator station
3 Thermocouple 40× Zone thermocouples
4 Burner Controller 12× Burner zone controllers
5 Oxygen Probe 4× Oxygen probes
6 Wire Bundle 1× Control wiring
7 Connector 16× Field connectors

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Combustion Control System

7 top-level lines · 14 rows shown · 90 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Kiln PLC 4 parts brick-tunnel-kiln-plc 1× 1 13 assembly
1.1 Microcontroller mcu 1× 1 · part
1.2 Bare PCB pcb-bare 3× 3 · part
1.3 SMD Passive (R/C/L) smd-passives 1× 1 · part
1.4 Relay relay 8× 8 · part
2 Operator Station 3 parts brick-tunnel-kiln-hmi 1× 1 4 assembly
2.1 LCD Panel lcd-panel 1× 1 · part
2.2 Bare PCB pcb-bare 1× 1 · part
2.3 Connector connector 2× 2 · part
3 Thermocouple brick-tunnel-kiln-thermocouple 40× 40 · part
4 Burner Controller brick-tunnel-kiln-burner-controller 12× 12 · part
5 Oxygen Probe brick-tunnel-kiln-o2-probe 4× 4 · part
6 Wire Bundle wire-bundle 1× 1 · part
7 Connector connector 16× 16 · part

Something wrong in this list? Report a problem with this BOM.

Where the combustion control system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks