Piping Systems
AssemblyBallast, bilge, fuel, cooling and fire mains running through the engine room, pipe tunnel and double bottom. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Piping Systems
5 top-level lines as of r19629| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pipe Spool | bulk-carrier-ship-pipe-spool | 3000× | 3,000 | · | part |
| 2 | Pipe Flange | bulk-carrier-ship-pipe-flange | 6000× | 6,000 | · | part |
| 3 | O-Ring Set | oring-set | 4500× | 4,500 | · | part |
| 4 | Pipe Valve | bulk-carrier-ship-pipe-valve | 1800× | 1,800 | · | part |
| 5 | Pipe Hanger | bulk-carrier-ship-pipe-hanger | 9000× | 9,000 | · | part |