Mounting and Plumbing
AssemblyStand structure with integrated plumbing fittings for sump or tank integration. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Mounting and Plumbing
4 top-level lines as of r21374| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Stand Structure | calcium-reactor-stand-bracket | 1× | 1 | · | part |
| 2 | Intake Tubing | calcium-reactor-input-line | 1× | 1 | · | part |
| 3 | Output Tubing | calcium-reactor-output-line | 1× | 1 | · | part |
| 4 | CO₂ Supply Tubing | calcium-reactor-co2-supply-line | 1× | 1 | · | part |