BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Deckhouse

Assembly

Aft accommodation block with crew cabins, the cargo-control room for the self-discharge plant and the navigation bridge. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Deckhouse parts and their functions

6 top-level parts · 1,452 parts in total · full bill of materials below
Deckhouse parts diagram: 1 crew cabin, 2 bridge console, 3 cargo control room, 4 HVAC plant, 5 deckhouse window, 6 accommodation panel. 1,452 parts in 6 assemblies.
Deckhouse parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Crew Cabin 4 parts 16× Crew cabins
2 Bridge Console 5 parts Navigation console
3 Cargo Control Room 5 parts Cargo-handling control room
4 HVAC Plant 4 parts Accommodation air-conditioning
5 Deckhouse Window 32× Windows
6 Accommodation Panel 350× Lined bulkhead and ceiling panels

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Deckhouse

6 top-level lines · 29 rows shown · 1,452 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Crew Cabin 4 parts cement-carrier-ship-crew-cabin 16× 16 24 assembly
1.1 Sheet Metal Panel sheet-panel 12× 192 · part
1.2 Seat Assembly 5 parts seat-assembly 16 7 assembly
1.2.1 Seat Frame seat-frame 16 · part
1.2.2 Seat Foam seat-foam 32 · part
1.2.3 Seat Cover seat-cover 16 · part
1.2.4 Seat Motor seat-motor 32 · part
1.2.5 Seat Heater Mat seat-heater 16 · part
1.3 LCD Panel lcd-panel 16 · part
1.4 Wire Bundle wire-bundle 64 · part
2 Bridge Console 5 parts cement-carrier-ship-bridge-console 1 202 assembly
2.1 LCD Panel lcd-panel 8 · part
2.2 Microcontroller mcu 4 · part
2.3 Connector connector 120× 120 · part
2.4 Relay relay 30× 30 · part
2.5 Wire Bundle wire-bundle 40× 40 · part
3 Cargo Control Room 5 parts cement-carrier-ship-cargo-control 1 198 assembly
3.1 LCD Panel lcd-panel 4 · part
3.2 Microcontroller mcu 4 · part
3.3 Relay relay 60× 60 · part
3.4 Connector connector 100× 100 · part
3.5 Wire Bundle wire-bundle 30× 30 · part
4 HVAC Plant 4 parts cement-carrier-ship-hvac-plant 1 286 assembly
4.1 Heating Element heating-element 4 · part
4.2 Coolant Pump coolant-pump 2 · part
4.3 HVAC Duct Section cement-carrier-ship-duct-section 80× 80 · part
4.4 Fastener Set fastener-set 200× 200 · part
5 Deckhouse Window cement-carrier-ship-deckhouse-window 32× 32 · part
6 Accommodation Panel cement-carrier-ship-bulkhead-panel 350× 350 · part

Where the deckhouse is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks