Hull Structure
AssemblyA bulk-carrier hull with a wide double bottom and hopper tanks shaped to channel fluidised cement toward the discharge points, sealed against moisture which would set the cargo. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Hull Structure parts and their functions
8 top-level parts · 22,683 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Hull Steel Plate | 800× | Shipbuilding plate, 12–35 mm |
| 2 | Hull Stiffener | 1600× | Longitudinal profiles |
| 3 | Web Frame | 60× | Transverse deep frames |
| 4 | Hopper Plate | 200× | Sloped hopper and topside plating |
| 5 | Watertight Bulkhead | 7× | Watertight transverse bulkheads |
| 6 | Hull Weld | 20000× | Plate and profile welds |
| 7 | Ballast Tank | 12× | Double-bottom and wing ballast tanks |
| 8 | Sea Chest | 4× | Sea-water inlet boxes |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Hull Structure
8 top-level lines · 8 rows shown · 22,683 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Hull Steel Plate | cement-carrier-ship-steel-plate | 800× | 800 | · | part |
| 2 | Hull Stiffener | cement-carrier-ship-stiffener | 1600× | 1,600 | · | part |
| 3 | Web Frame | cement-carrier-ship-web-frame | 60× | 60 | · | part |
| 4 | Hopper Plate | cement-carrier-ship-hopper-plate | 200× | 200 | · | part |
| 5 | Watertight Bulkhead | cement-carrier-ship-bulkhead | 7× | 7 | · | part |
| 6 | Hull Weld | cement-carrier-ship-hull-weld | 20000× | 20,000 | · | part |
| 7 | Ballast Tank | cement-carrier-ship-ballast-tank | 12× | 12 | · | part |
| 8 | Sea Chest | cement-carrier-ship-sea-chest | 4× | 4 | · | part |
Where the hull structure is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |