BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Electrical System

Assembly

Cranking and house batteries, pumps, lights and wiring. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Electrical System parts and their functions

6 top-level parts · 12 parts in total · full bill of materials below
Electrical System parts diagram: 1 cranking battery, 2 house battery, 3 battery switch, 4 bilge pump, 5 navigation light, 6 wire bundle. 12 parts in 6 assemblies.
Electrical System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cranking Battery One per engine
2 House Battery Deep-cycle battery powering pumps, lights and electronics.
3 Battery Switch Selector and combiner isolating the cranking and house banks.
4 Bilge Pump 2 parts Submersible pump with float switch clearing bilge water.
5 Navigation Light LED bow and stern lights meeting running-light rules.
6 Wire Bundle Group of insulated conductors cut to length, terminated, and bound together to carry power and signals between the assemblies of a machine.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Electrical System

6 top-level lines · 8 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cranking Battery center-console-boat-cranking-battery 2 · part
2 House Battery center-console-boat-house-battery 1 · part
3 Battery Switch center-console-boat-battery-switch 1 · part
4 Bilge Pump 2 parts center-console-boat-bilge-pump 2 2 assembly
4.1 Pump Motor center-console-boat-pump-motor 2 · part
4.2 Float Switch center-console-boat-float-switch 2 · part
5 Navigation Light center-console-boat-nav-light 3 · part
6 Wire Bundle wire-bundle 1 · part

Where the electrical system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks