Cargo Control Room
AssemblyThe console from which cargo officers run multi-parcel loading, discharge, heating and blanketing with per-tank gauging and valve control. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Control Room parts and their functions
5 top-level parts · 214 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | LCD Panel | 6× | Mimic and gauging displays |
| 2 | Cargo Level Gauge | 4× | Repeater gauging |
| 3 | Microcontroller | 4× | Valve and pump control boards |
| 4 | Connector | 160× | Mating plug-and-socket pair that joins two lengths of wiring or a cable to a board so a circuit can be assembled, serviced, and separated without soldering. |
| 5 | Relay | 40× | Electromechanical switch in which a small coil current closes or opens contacts rated for a much larger load, isolating control circuits from what they switch. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Control Room
5 top-level lines · 5 rows shown · 214 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | LCD Panel | lcd-panel | 6× | 6 | · | part |
| 2 | Cargo Level Gauge | chemical-tanker-level-gauge | 4× | 4 | · | part |
| 3 | Microcontroller | mcu | 4× | 4 | · | part |
| 4 | Connector | connector | 160× | 160 | · | part |
| 5 | Relay | relay | 40× | 40 | · | part |
Where the cargo control room is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $300–$90k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BYD
byd.com ↗
|
Shenzhen, CN | EV & battery manufacturer | made to order | · |
| tatamotors.com ↗ | Mumbai, IN | Automaker | made to order | · |
| saicmotor.com ↗ | Shanghai, CN | Automaker | made to order | · |
|
🇮🇳Mahindra
mahindra.com ↗
|
Mumbai, IN | Automaker | made to order | · |
|
🇨🇳Geely
global.geely.com ↗
|
Hangzhou, CN | Automaker | made to order | · |