Cargo Handling System
AssemblyThe hydraulic power pack driving the deepwell pumps, the dedicated deck lines that keep each parcel separate, and the manifolds where parcels load and discharge. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Handling System parts and their functions
6 top-level parts · 180 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Hydraulic Power Pack | 2× | Hydraulic power packs for deepwell pumps |
| 2 | Cargo Deck Line | 24× | Dedicated cargo deck lines, one per tank group |
| 3 | Cargo Manifold | 2× | Port and starboard manifolds |
| 4 | Cargo Valve | 120× | Cargo and segregation valves |
| 5 | Pressure Sensor | 24× | Line and pump pressure transmitters |
| 6 | Drip Tray | 8× | Manifold and valve drip trays |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Handling System
6 top-level lines · 6 rows shown · 180 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Hydraulic Power Pack | chemical-tanker-hpu | 2× | 2 | · | part |
| 2 | Cargo Deck Line | chemical-tanker-deck-line | 24× | 24 | · | part |
| 3 | Cargo Manifold | chemical-tanker-cargo-manifold | 2× | 2 | · | part |
| 4 | Cargo Valve | chemical-tanker-cargo-valve | 120× | 120 | · | part |
| 5 | Pressure Sensor | pressure-sensor | 24× | 24 | · | part |
| 6 | Drip Tray | chemical-tanker-drip-tray | 8× | 8 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cargo handling system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |