Cargo Tank
AssemblyOne small segregated parcel tank in duplex stainless steel or zinc/epoxy coating, with its own deepwell pump, heating coil, gauging and a dedicated cargo line so different chemicals never mix. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Tank parts and their functions
7 top-level parts · 1,407 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tank Wall | 1× | Stainless or coated tank boundary |
| 2 | Deepwell Pump | 1× | Hydraulic submerged cargo pump |
| 3 | Cargo Heating Coil | 1× | Stainless cargo heating coil |
| 4 | Cargo Level Gauge | 1× | Cargo level and temperature gauge |
| 5 | P/V Valve | 1× | Pressure/vacuum vent |
| 6 | Tank Cleaning Machine | 2× | Fixed tank cleaning machines |
| 7 | Tank Structure Weld | 1400× | Welds joining boundary, brackets and fittings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Tank
7 top-level lines · 7 rows shown · 1,407 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tank Wall | chemical-tanker-tank-wall | 1× | 1 | · | part |
| 2 | Deepwell Pump | chemical-tanker-deepwell-pump | 1× | 1 | · | part |
| 3 | Cargo Heating Coil | chemical-tanker-heating-coil | 1× | 1 | · | part |
| 4 | Cargo Level Gauge | chemical-tanker-level-gauge | 1× | 1 | · | part |
| 5 | P/V Valve | chemical-tanker-pv-valve | 1× | 1 | · | part |
| 6 | Tank Cleaning Machine | chemical-tanker-tank-cleaning-machine | 2× | 2 | · | part |
| 7 | Tank Structure Weld | chemical-tanker-tank-weld | 1400× | 1,400 | · | part |
Where the cargo tank is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $300–$90k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BYD
byd.com ↗
|
Shenzhen, CN | EV & battery manufacturer | made to order | · |
| tatamotors.com ↗ | Mumbai, IN | Automaker | made to order | · |
| saicmotor.com ↗ | Shanghai, CN | Automaker | made to order | · |
|
🇮🇳Mahindra
mahindra.com ↗
|
Mumbai, IN | Automaker | made to order | · |
|
🇨🇳Geely
global.geely.com ↗
|
Hangzhou, CN | Automaker | made to order | · |