Central air-conditioning plant holding the accommodation at slight overpressure against cargo vapour. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

HVAC Plant parts and their functions

5 top-level parts · 354 parts in total · full bill of materials below
HVAC Plant parts diagram: 1 air-handling unit, 2 coolant pump, 3 fan-coil unit, 4 HVAC duct section, 5 fastener set. 354 parts in 5 assemblies.
HVAC Plant parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Air-Handling Unit 2× Air-handling units
2 Coolant Pump 2× Chilled-water pumps
3 Fan-Coil Unit 30× Cabin fan-coil units
4 HVAC Duct Section 120× Insulated ducting
5 Fastener Set 200× Duct hangers and unit fixings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for HVAC Plant

5 top-level lines · 5 rows shown · 354 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Air-Handling Unit chemical-tanker-ahu 2× 2 · part
2 Coolant Pump coolant-pump 2× 2 · part
3 Fan-Coil Unit chemical-tanker-fan-coil 30× 30 · part
4 HVAC Duct Section chemical-tanker-duct-section 120× 120 · part
5 Fastener Set fastener-set 200× 200 · part

Where the HVAC plant is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks