BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

XY Stage Assembly

Assembly

Computer-controlled linear table with stepper or servo motors, precision screws, and bearings for horizontal and vertical key positioning. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

XY Stage Assembly parts and their functions

5 top-level parts · 9 parts in total · full bill of materials below
XY Stage Assembly parts diagram: 1 x-axis motor, 2 y-axis motor, 3 ballscrew pair, 4 linear rail, 5 stage plate. 9 parts in 5 top-level items.
XY Stage Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 X-Axis Motor 1× Stepper/servo for X travel
2 Y-Axis Motor 1× Stepper/servo for Y travel
3 Ballscrew Pair 2× X and Y precision lead screws
4 Linear Rail 4× Roller or ball bearing rails
5 Stage Plate 1× Aluminum or cast iron table

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for XY Stage Assembly

5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 X-Axis Motor cnc-key-cutter-x-axis-motor 1× 1 · part
2 Y-Axis Motor cnc-key-cutter-y-axis-motor 1× 1 · part
3 Ballscrew Pair cnc-key-cutter-ballscrew-pair 2× 2 · part
4 Linear Rail cnc-key-cutter-linear-rail 4× 4 · part
5 Stage Plate cnc-key-cutter-stage-plate 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the XY stage assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks