Firefighting and Damage Control
AssemblyFire pumps, hydrants, bilge pumping and fixed extinguishing for safety of the ship. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Firefighting and Damage Control parts and their functions
8 top-level parts · 31 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Fire Pump | 2× | Engine-driven or electric pump pressurising the fire main with seawater. |
| 2 | Fire Main | 1× | Ring of piping distributing pressurised seawater to hydrants around the ship. |
| 3 | Fire Hydrant | 8× | Valved outlet on the fire main for connecting a hose. |
| 4 | Bilge Pump | 2× | Pump removing accumulated water from the bilges and flooded compartments. |
| 5 | Foam System | 1× | Proportioner and monitor delivering firefighting foam onto fuel fires on deck. |
| 6 | CO2 System | 1× | engine room |
| 7 | Fire Detector | 12× | Smoke or heat sensor reporting fire to the bridge alarm panel. |
| 8 | Pressure Sensor | 4× | Transduces fluid or gas pressure into an electrical signal. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Firefighting and Damage Control
8 top-level lines · 8 rows shown · 31 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fire Pump | coast-guard-cutter-fire-pump | 2× | 2 | · | part |
| 2 | Fire Main | coast-guard-cutter-fire-main | 1× | 1 | · | part |
| 3 | Fire Hydrant | coast-guard-cutter-hydrant | 8× | 8 | · | part |
| 4 | Bilge Pump | coast-guard-cutter-bilge-pump | 2× | 2 | · | part |
| 5 | Foam System | coast-guard-cutter-foam-system | 1× | 1 | · | part |
| 6 | CO2 System | coast-guard-cutter-co2-system | 1× | 1 | · | part |
| 7 | Fire Detector | coast-guard-cutter-fire-detector | 12× | 12 | · | part |
| 8 | Pressure Sensor | pressure-sensor | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the firefighting and damage control is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |