BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Alarm System

Assembly

Flow switch activates audible solenoid alarm horn when water flows through shower. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Alarm System parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Alarm System parts diagram: 1 flow switch, 2 alarm solenoid, 3 alarm bell, 4 alarm timer. 4 parts in 4 top-level items.
Alarm System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Flow Switch 1× Turbine flow sensor activates at >5 gpm
2 Alarm Solenoid 1× 24V DC solenoid with spring-loaded striker
3 Alarm Bell 1× Brass bell 6 inch diameter, 100 dB @ 1 meter
4 Alarm Timer 1× Latching relay holds alarm on for 5 minutes minimum

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Alarm System

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Flow Switch combination-safety-shower-flow-switch 1× 1 · part
2 Alarm Solenoid combination-safety-shower-alarm-solenoid 1× 1 · part
3 Alarm Bell combination-safety-shower-alarm-bell 1× 1 · part
4 Alarm Timer combination-safety-shower-alarm-timer 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the alarm system is used

2 products across 2 domains contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks