BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Shower Head

Assembly

Overhead spray nozzle array delivers water at 60+ gpm with rain-like pattern to drench entire body. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Shower Head parts and their functions

4 top-level parts · 15 parts in total · full bill of materials below
Shower Head parts diagram: 1 spray arm, 2 spray nozzle, 3 nozzle ring, 4 flow control. 15 parts in 4 top-level items.
Shower Head parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Spray Arm 1× Horizontal 1 inch stainless steel pipe arm
2 Spray Nozzle 12× Individual spray nozzles 1/8 inch orifice each
3 Nozzle Ring 1× Support ring holds nozzles in circular pattern
4 Flow Control 1× Adjustable restrictor valve 60–80 gpm range

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Shower Head

4 top-level lines · 4 rows shown · 15 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Spray Arm combination-safety-shower-shower-spray-arm 1× 1 · part
2 Spray Nozzle combination-safety-shower-nozzle-cluster 12× 12 · part
3 Nozzle Ring combination-safety-shower-spray-ring 1× 1 · part
4 Flow Control combination-safety-shower-flow-control 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the shower head is used

2 products across 2 domains contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks