BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

HVAC Plant

Assembly

Central air handling unit conditioning accommodation and bridge spaces. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

HVAC Plant parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
HVAC Plant parts diagram: 1 air handling fan, 2 cooling coil, 3 heating element, 4 drive belt, 5 air filter. 8 parts in 5 top-level items.
HVAC Plant parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Air Handling Fan 1× Supply air fan with motor
2 Cooling Coil 1× Chilled water or direct expansion cooling coil
3 Heating Element 1× Electric reheat element for cabin temperature trim
4 Drive Belt 1× Fan drive belt
5 Air Filter 4× Supply air filter panel

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for HVAC Plant

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Air Handling Fan container-feeder-ship-ahu-fan 1× 1 · part
2 Cooling Coil container-feeder-ship-cooling-coil 1× 1 · part
3 Heating Element heating-element 1× 1 · part
4 Drive Belt drive-belt 1× 1 · part
5 Air Filter container-feeder-ship-air-filter 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the HVAC plant is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks