Piping Systems
AssemblyBallast, fuel, cooling, fire and bilge mains, on the order of 11,000 prefabricated spools joined by tens of thousands of flanges through the ship. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Piping Systems
5 top-level lines as of r36800| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pipe Spool | container-ship-pipe-spool | 11000× | 11,000 | · | part |
| 2 | Pipe Flange | container-ship-pipe-flange | 22000× | 22,000 | · | part |
| 3 | O-Ring Set | oring-set | 16000× | 16,000 | · | part |
| 4 | Pipe Valve | container-ship-pipe-valve | 6500× | 6,500 | · | part |
| 5 | Pipe Hanger | container-ship-pipe-hanger | 30000× | 30,000 | · | part |