BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Davit Arm

Assembly

Swinging steel beam (5–8 m reach), pivots on deck bushing, connected to haul-line and pot block via heave-compensator cylinder. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Davit Arm parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Davit Arm parts diagram: 1 davit beam, 2 davit pivot, 3 davit tag line, 4 heave compensator. 4 parts in 4 top-level items.
Davit Arm parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Davit Beam 1× Welded steel I-beam or tube, 5–8 m length, rated 10–20 tonnes suspended load
2 Davit Pivot 1× Welded deck-mounted pivot post with bushings, rated for full swing and load
3 Davit Tag Line 1× Safety rope or cable, prevents wild swing in seas
4 Heave Compensator 1× Passive or active cylinder with nitrogen charge, absorbs wave-induced motion

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Davit Arm

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Davit Beam crab-block-hauler-davit-beam 1× 1 · part
2 Davit Pivot crab-block-hauler-davit-pivot 1× 1 · part
3 Davit Tag Line crab-block-hauler-davit-tag-line 1× 1 · part
4 Heave Compensator crab-block-hauler-heave-compensator 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the davit arm is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks