BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Crew Cabin

Assembly

Bunk cabin for the fishing crew. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Crew Cabin parts and their functions

3 top-level parts · 17 parts in total · full bill of materials below
Crew Cabin parts diagram: 1 sheet metal panel, 2 seat assembly, 3 wire bundle. 17 parts in 3 top-level items.
Crew Cabin parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Sheet Metal Panel 8× Flat or folded sheet-metal panel, cut and bent to shape, that forms the enclosure, guards, or skin of a machine.
2 Seat Assembly 5 parts 1× Complete seat: frame, foam, cover, adjusters, and heater, built as one unit and bolted into the cabin.
3 Wire Bundle 2× Group of insulated conductors cut to length, terminated, and bound together to carry power and signals between the assemblies of a machine.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Crew Cabin

3 top-level lines · 8 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sheet Metal Panel sheet-panel 8× 8 · part
2 Seat Assembly 5 parts seat-assembly 1× 1 7 assembly
2.1 Seat Frame seat-frame 1× 1 · part
2.2 Seat Foam seat-foam 2× 2 · part
2.3 Seat Cover seat-cover 1× 1 · part
2.4 Seat Motor seat-motor 2× 2 · part
2.5 Seat Heater Mat seat-heater 1× 1 · part
3 Wire Bundle wire-bundle 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the crew cabin is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks