Pot System
AssemblyThe fishing gear: heavy welded-steel pots that sit on the seabed catching crab, each baited and connected by a line to a marker buoy at the surface. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Pot System parts and their functions
5 top-level parts · 2,000 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Crab Pot 4 parts | 200× | Welded-steel crab pots |
| 2 | Pot Line | 200× | Buoy lines and groundlines |
| 3 | Marker Buoy | 200× | Surface marker buoys |
| 4 | Bait Jar | 200× | Bait jars and hooks |
| 5 | Pot Shackle | 400× | Line shackles and snaps |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Pot System
5 top-level lines · 9 rows shown · 2,000 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Crab Pot 4 parts | crab-boat-crab-pot | 200× | 200 | 5 | assembly |
| 1.1 | Pot Frame | crab-boat-pot-frame | 1× | 200 | · | part |
| 1.2 | Pot Mesh | crab-boat-pot-mesh | 1× | 200 | · | part |
| 1.3 | Entrance Tunnel | crab-boat-pot-tunnel | 2× | 400 | · | part |
| 1.4 | Pot Door | crab-boat-pot-door | 1× | 200 | · | part |
| 2 | Pot Line | crab-boat-pot-line | 200× | 200 | · | part |
| 3 | Marker Buoy | crab-boat-buoy | 200× | 200 | · | part |
| 4 | Bait Jar | crab-boat-bait-jar | 200× | 200 | · | part |
| 5 | Pot Shackle | crab-boat-pot-shackle | 400× | 400 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the pot system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |