Hull Structure
AssemblyTwin catamaran hulls of composite and aluminium, with transverse bridging and internal bulkheads. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Hull Structure parts and their functions
6 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Port Hull | 1× | Composite or aluminium tube with internal watertight bulkheads and flotation chambers. |
| 2 | Starboard Hull | 1× | Mirror of port hull, housing waterjet intakes and a fuel tank compartment. |
| 3 | Cross Connection | 2× | Transverse beam girder joining the two hulls and supporting the superstructure. |
| 4 | Deck Plating | 1× | Aluminium or composite panel forming the weather deck between the hulls. |
| 5 | Cabin Foundation | 1× | Rigid steel or composite frame absorbing vibration from the engines. |
| 6 | Engine Bed | 1× | Stiff support structure isolating engine thrust and vibration from the hulls. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Hull Structure
6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Port Hull | crew-transfer-vessel-port-hull | 1× | 1 | · | part |
| 2 | Starboard Hull | crew-transfer-vessel-starboard-hull | 1× | 1 | · | part |
| 3 | Cross Connection | crew-transfer-vessel-cross-connection | 2× | 2 | · | part |
| 4 | Deck Plating | crew-transfer-vessel-deck-plating | 1× | 1 | · | part |
| 5 | Cabin Foundation | crew-transfer-vessel-cabin-foundation | 1× | 1 | · | part |
| 6 | Engine Bed | crew-transfer-vessel-engine-bed | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the hull structure is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |