Mooring System
AssemblyBitts, cleats and pad-eyes for securing towing lines and docking to quays. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Mooring System parts and their functions
7 top-level parts · 40 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bow Bitts | 2× | Sturdy welded post pair at the stem for bow lines and anchoring. |
| 2 | Stern Bitts | 2× | Bitts at the sternpost for stern lines. |
| 3 | Towing Bitts | 2× | amidships pull points |
| 4 | Side Cleat | 8× | Single or dual horn cleats on the rail for docking lines. |
| 5 | Pad Eye | 16× | lashing and securing |
| 6 | Fairlead | 6× | line guidance |
| 7 | Mooring Post | 4× | Vertical tubular post at the barge corners stiffening the rail. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Mooring System
7 top-level lines · 7 rows shown · 40 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bow Bitts | deck-barge-bow-bitts | 2× | 2 | · | part |
| 2 | Stern Bitts | deck-barge-stern-bitts | 2× | 2 | · | part |
| 3 | Towing Bitts | deck-barge-towing-bitts | 2× | 2 | · | part |
| 4 | Side Cleat | deck-barge-side-cleat | 8× | 8 | · | part |
| 5 | Pad Eye | deck-barge-pad-eye | 16× | 16 | · | part |
| 6 | Fairlead | deck-barge-fairlead | 6× | 6 | · | part |
| 7 | Mooring Post | deck-barge-mooring-post | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the mooring system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |