BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control Cabin

Assembly

Operator cabin with seating and the dredge control console. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control Cabin parts and their functions

2 top-level parts · 22 parts in total · full bill of materials below
Control Cabin parts diagram: 1 seat assembly, 2 dredge control console. 22 parts in 2 top-level items.
Control Cabin parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Seat Assembly 5 parts 1× Operator chair
2 Dredge Control Console 5 parts 1× Touchscreen console monitoring and steering the dredge process.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control Cabin

2 top-level lines · 12 rows shown · 22 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Seat Assembly 5 parts seat-assembly 1× 1 7 assembly
1.1 Seat Frame seat-frame 1× 1 · part
1.2 Seat Foam seat-foam 2× 2 · part
1.3 Seat Cover seat-cover 1× 1 · part
1.4 Seat Motor seat-motor 2× 2 · part
1.5 Seat Heater Mat seat-heater 1× 1 · part
2 Dredge Control Console 5 parts dr-console 1× 1 15 assembly
2.1 LCD Panel lcd-panel 2× 2 · part
2.2 Touch Digitizer touch-digitizer 1× 1 · part
2.3 Bare PCB pcb-bare 2× 2 · part
2.4 Microcontroller mcu 2× 2 · part
2.5 Relay relay 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the control cabin is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks