Cargo Hopper
AssemblyThe large open-topped tank that holds the dredged sand; as the pump fills it, water overflows a weir while the sand settles, and the load is dumped through hydraulically operated bottom doors. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Hopper parts and their functions
7 top-level parts · 5,214 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bottom Door | 14× | Hydraulic bottom doors |
| 2 | Door Cylinder 4 parts | 14× | Door hydraulic cylinders |
| 3 | Overflow Weir | 2× | Adjustable overflow weirs |
| 4 | Hopper Liner | 80× | Wear lining of the hopper walls |
| 5 | Density Meter | 4× | Hopper density and tonnage meters |
| 6 | Overflow Degassing | 2× | Overflow degassing systems |
| 7 | Hopper Weld | 5000× | Welds attaching doors, weirs and lining |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Hopper
7 top-level lines · 11 rows shown · 5,214 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bottom Door | dredger-ship-bottom-door | 14× | 14 | · | part |
| 2 | Door Cylinder 4 parts | dredger-ship-door-cylinder | 14× | 14 | 8 | assembly |
| 2.1 | Cylinder Barrel | dredger-ship-cylinder-barrel | 1× | 14 | · | part |
| 2.2 | Cylinder Piston Rod | dredger-ship-piston-rod | 1× | 14 | · | part |
| 2.3 | O-Ring Set | oring-set | 4× | 56 | · | part |
| 2.4 | Oil Seal | oil-seal | 2× | 28 | · | part |
| 3 | Overflow Weir | dredger-ship-overflow | 2× | 2 | · | part |
| 4 | Hopper Liner | dredger-ship-hopper-liner | 80× | 80 | · | part |
| 5 | Density Meter | dredger-ship-density-meter | 4× | 4 | · | part |
| 6 | Overflow Degassing | dredger-ship-degassing | 2× | 2 | · | part |
| 7 | Hopper Weld | dredger-ship-hopper-weld | 5000× | 5,000 | · | part |
Where the cargo hopper is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $300–$90k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BYD
byd.com ↗
|
Shenzhen, CN | EV & battery manufacturer | made to order | · |
| tatamotors.com ↗ | Mumbai, IN | Automaker | made to order | · |
| saicmotor.com ↗ | Shanghai, CN | Automaker | made to order | · |
|
🇮🇳Mahindra
mahindra.com ↗
|
Mumbai, IN | Automaker | made to order | · |
|
🇨🇳Geely
global.geely.com ↗
|
Hangzhou, CN | Automaker | made to order | · |