BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Steel Frame

Assembly

Welded structural steel frame 3 m × 2.5 m × 3 m high with I-beam supports and walkway platform. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Steel Frame parts and their functions

5 top-level parts · 13 parts in total · full bill of materials below
Main Steel Frame parts diagram: 1 structural i-beam, 2 support column, 3 operator walkway, 4 welds, 5 fastener set. 13 parts in 5 top-level items.
Main Steel Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Structural I-Beam 4× Steel I-beam 300 × 100 mm sections
2 Support Column 4× Vertical support columns 200 mm diameter tube
3 Operator Walkway 1× Staircase and platform for operators
4 Welds 1× Structural welds per DIN EN 1993-1-8, full penetration
5 Fastener Set 3× Anchor bolts and connection hardware for concrete foundation

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Steel Frame

5 top-level lines · 5 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Structural I-Beam elephant-restraint-device-main-beam 4× 4 · part
2 Support Column elephant-restraint-device-column 4× 4 · part
3 Operator Walkway elephant-restraint-device-walkway 1× 1 · part
4 Welds elephant-restraint-device-welds 1× 1 · part
5 Fastener Set fastener-set 3× 3 · part

Something wrong in this list? Report a problem with this BOM.

Where the main steel frame is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks