BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Front Head Gate Assembly

Assembly

Vertical sliding gate controlling head position and preventing forward escape. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Front Head Gate Assembly parts and their functions

4 top-level parts · 5 parts in total · full bill of materials below
Front Head Gate Assembly parts diagram: 1 head gate panel, 2 head gate cylinder, 3 safety backup chain, 4 vertical guide channel. 5 parts in 4 top-level items.
Front Head Gate Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Head Gate Panel 1× Steel sheet gate 2.5 m × 1.5 m
2 Head Gate Cylinder 1× Hydraulic cylinder 63 mm bore × 600 mm stroke
3 Safety Backup Chain 1× Safety chain backup to cylinder, 16 mm diameter
4 Vertical Guide Channel 2× Vertical guide channels with stop blocks

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Front Head Gate Assembly

4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Head Gate Panel elephant-restraint-device-head-gate-panel 1× 1 · part
2 Head Gate Cylinder elephant-restraint-device-head-gate-cylinder 1× 1 · part
3 Safety Backup Chain elephant-restraint-device-head-gate-chain 1× 1 · part
4 Vertical Guide Channel elephant-restraint-device-guide-rail 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the front head gate assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks