BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Frame and Tanks

Assembly

Stainless tanks and the structural frame carrying the whole range, with bunding against caustic spills. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Frame and Tanks parts and their functions

7 top-level parts · 33 parts in total · full bill of materials below
Frame and Tanks parts diagram: 1 main frame, 2 stainless process tank, 3 bunded drip tray, 4 maintenance walkway, 5 sheet metal panel, 6 fastener set, 7 coil spring. 33 parts in 7 top-level items.
Frame and Tanks parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Frame 1× Welded structural frame
2 Stainless Process Tank 4× Process tanks and trough bodies
3 Bunded Drip Tray 6× Bunded drip trays under wet sections
4 Maintenance Walkway 1× Maintenance walkway and ladders
5 Sheet Metal Panel 12× Stainless cladding panels
6 Fastener Set 1× Structural and panel fasteners
7 Coil Spring 8× Clip and dancer springs

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Frame and Tanks

7 top-level lines · 7 rows shown · 33 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Frame fabric-mercerizing-range-main-frame 1× 1 · part
2 Stainless Process Tank fabric-mercerizing-range-stainless-tank 4× 4 · part
3 Bunded Drip Tray fabric-mercerizing-range-drip-tray 6× 6 · part
4 Maintenance Walkway fabric-mercerizing-range-walkway 1× 1 · part
5 Sheet Metal Panel sheet-panel 12× 12 · part
6 Fastener Set fastener-set 1× 1 · part
7 Coil Spring coil-spring 8× 8 · part

Where the frame and tanks is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks