BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Yarn Feeding

Assembly

The yarn carriers running on rails above the needle beds, with side and top tension units that meter yarn to the needles and stop the machine on a break or knot. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Yarn Feeding parts and their functions

5 top-level parts · 30 parts in total · full bill of materials below
Yarn Feeding parts diagram: 1 yarn carrier, 2 carrier rail, 3 side tension unit, 4 top tension assembly, 5 yarn break detector. 30 parts in 5 top-level items.
Yarn Feeding parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Yarn Carrier 8× Yarn carriers
2 Carrier Rail 4× Carrier rails
3 Side Tension Unit 2× Side tension units
4 Top Tension Assembly 8× Top tension assemblies
5 Yarn Break Detector 8× Yarn break detectors

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Yarn Feeding

5 top-level lines · 5 rows shown · 30 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Yarn Carrier flat-knitting-machine-yarn-carrier 8× 8 · part
2 Carrier Rail flat-knitting-machine-carrier-rail 4× 4 · part
3 Side Tension Unit flat-knitting-machine-side-tension 2× 2 · part
4 Top Tension Assembly flat-knitting-machine-top-tension 8× 8 · part
5 Yarn Break Detector flat-knitting-machine-yarn-sensor 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the yarn feeding is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks