Accommodation
AssemblyCabins, galley and heads in the lower deck. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Accommodation parts and their functions
3 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cabin 2 parts | 2× | Sleeping cabin with a berth and stowage. |
| 2 | Galley 3 parts | 1× | Cooking and refrigeration module. |
| 3 | Marine Head 2 parts | 2× | Toilet compartment with a shower. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Accommodation
3 top-level lines · 10 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cabin 2 parts | flybridge-cruiser-cabin | 2× | 2 | 2 | assembly |
| 1.1 | Berth | flybridge-cruiser-berth | 1× | 2 | · | part |
| 1.2 | Wardrobe | flybridge-cruiser-wardrobe | 1× | 2 | · | part |
| 2 | Galley 3 parts | flybridge-cruiser-galley | 1× | 1 | 3 | assembly |
| 2.1 | Marine Stove | flybridge-cruiser-stove | 1× | 1 | · | part |
| 2.2 | Galley Refrigerator | flybridge-cruiser-fridge | 1× | 1 | · | part |
| 2.3 | Galley Sink | flybridge-cruiser-sink | 1× | 1 | · | part |
| 3 | Marine Head 2 parts | flybridge-cruiser-head | 2× | 2 | 2 | assembly |
| 3.1 | Marine Toilet | flybridge-cruiser-toilet | 1× | 2 | · | part |
| 3.2 | Shower Set | flybridge-cruiser-shower | 1× | 2 | · | part |
Where the accommodation is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |