BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hardtop

Assembly

Moulded GRP hardtop on stainless posts shading the flybridge. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hardtop parts and their functions

3 top-level parts · 6 parts in total · full bill of materials below
Hardtop parts diagram: 1 hardtop moulding, 2 hardtop post, 3 bimini extension. 6 parts in 3 top-level items.
Hardtop parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hardtop Moulding 1× GRP roof panel over the upper helm.
2 Hardtop Post 4× Polished stainless support post.
3 Bimini Extension 1× Aft canvas extension

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hardtop

3 top-level lines · 3 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hardtop Moulding flybridge-cruiser-hardtop-moulding 1× 1 · part
2 Hardtop Post flybridge-cruiser-hardtop-post 4× 4 · part
3 Bimini Extension flybridge-cruiser-bimini 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the hardtop is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks