Edge Protection

Assembly

The handrail and toe board run round the open table so crews can work and tie steel on it safely before the pour. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Edge Protection parts and their functions

5 top-level parts · 48 parts in total · full bill of materials below
Edge Protection parts diagram: 1 handrail post, 2 guard rail, 3 toe board, 4 post socket, 5 sheet metal panel. 48 parts in 5 top-level items.
Edge Protection parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Handrail Post 12× Handrail posts
2 Guard Rail 12× Guard rails
3 Toe Board 8× Toe boards
4 Post Socket 12× Post sockets
5 Sheet Metal Panel 4× Mesh infill panels

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Edge Protection

5 top-level lines · 5 rows shown · 48 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Handrail Post formwork-table-handrail-post 12× 12 · part
2 Guard Rail formwork-table-guard-rail 12× 12 · part
3 Toe Board formwork-table-toe-board 8× 8 · part
4 Post Socket formwork-table-post-socket 12× 12 · part
5 Sheet Metal Panel sheet-panel 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the edge protection is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks