BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Top Handrail Assembly

Assembly

Continuous top railing (stainless steel or aluminum) for grip safety, mounted 1100 mm above deck. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Top Handrail Assembly parts and their functions

4 top-level parts · 13 parts in total · full bill of materials below
Top Handrail Assembly parts diagram: 1 handrail extrusion, 2 handrail bracket, 3 rail-to-glass clamp, 4 handrail end cap. 13 parts in 4 top-level items.
Top Handrail Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Handrail Extrusion 1× Stainless 316 or anodized aluminum rail, circular or square profile
2 Handrail Bracket 4× Bracket supporting handrail above glass panels
3 Rail-to-Glass Clamp 6× Stainless clamp, attaches rail to glass or posts
4 Handrail End Cap 2× Stainless end cap, seals rail terminations

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Top Handrail Assembly

4 top-level lines · 4 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Handrail Extrusion glass-balustrade-system-handrail-extrusion 1× 1 · part
2 Handrail Bracket glass-balustrade-system-handrail-bracket 4× 4 · part
3 Rail-to-Glass Clamp glass-balustrade-system-rail-clamp 6× 6 · part
4 Handrail End Cap glass-balustrade-system-rail-end-cap 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the top handrail assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks