BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r78904 of this page, not the current version. Go to current · history

Setting Belt

Assembly

Long conveyor that carries the wet board while the gypsum hydrates and gains green strength. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Setting Belt

5 top-level lines as of r78904
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Conveyor Belt gypsum-board-line-belt 1× 1 · part
2 Belt Drive Pulley 4 parts gypsum-board-line-belt-drive 1× 1 0 assembly
3 Idler Roll gypsum-board-line-idler-roll 40× 40 · part
4 Belt Tracking Unit gypsum-board-line-tracking 1× 1 · part
5 Drive Belt drive-belt 1× 1 · part