Wet Transfer and Turnover

Assembly

Accelerating belts and a turnover that space the cut panels and flip them face-up for the dryer. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Wet Transfer and Turnover parts and their functions

5 top-level parts · 10 parts in total · full bill of materials below
Wet Transfer and Turnover parts diagram: 1 accelerating belt, 2 board turnover, 3 synchronizing belt, 4 booking station, 5 drive belt. 10 parts in 5 top-level items.
Wet Transfer and Turnover parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Accelerating Belt 3× Accelerating belts
2 Board Turnover 1× Board turnover
3 Synchronizing Belt 1× Synchronizing belt
4 Booking Station 1× Booking station
5 Drive Belt 4× Transfer drive belts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Wet Transfer and Turnover

5 top-level lines · 5 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Accelerating Belt gypsum-board-line-accel-belt 3× 3 · part
2 Board Turnover gypsum-board-line-turnover 1× 1 · part
3 Synchronizing Belt gypsum-board-line-synchro-belt 1× 1 · part
4 Booking Station gypsum-board-line-booking 1× 1 · part
5 Drive Belt drive-belt 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the wet transfer and turnover is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks