BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Dyeing Vessel

Assembly

Stainless steel tank holding the dye liquor and the loaded hank carrier; the HT version is a pressure vessel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Dyeing Vessel parts and their functions

11 top-level parts · 13 parts in total · full bill of materials below
Dyeing Vessel parts diagram: 1 vessel shell, 2 dished bottom, 3 liquor sump, 4 insulated jacket, 5 sight glass, 6 liquor level sensor, 7 temperature probe, 8 pressure sensor, 9 lid gasket, 10 o-ring set, 11 fastener set. 13 parts in 11 top-level items.
Dyeing Vessel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Vessel Shell 1× Cylindrical or rectangular 316L tank shell
2 Dished Bottom 1× Dished bottom with central liquor sump
3 Liquor Sump 1× Low sump feeding the pump suction
4 Insulated Jacket 1× Outer jacket and insulation reducing heat loss
5 Sight Glass 2× Sight glass for watching liquor level and shade
6 Liquor Level Sensor 1× Liquor level probe in the sump
7 Temperature Probe 2× RTD probes reading liquor temperature
8 Pressure Sensor 1× Vessel pressure transmitter for HT operation
9 Lid Gasket 1× Lid sealing gasket
10 O-Ring Set 1× Port and fitting seals
11 Fastener Set 1× Vessel bolting hardware

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Dyeing Vessel

11 top-level lines · 11 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vessel Shell hank-dyeing-machine-vessel-shell 1× 1 · part
2 Dished Bottom hank-dyeing-machine-vessel-bottom 1× 1 · part
3 Liquor Sump hank-dyeing-machine-liquor-sump 1× 1 · part
4 Insulated Jacket hank-dyeing-machine-vessel-jacket 1× 1 · part
5 Sight Glass hank-dyeing-machine-sight-glass 2× 2 · part
6 Liquor Level Sensor hank-dyeing-machine-level-sensor 1× 1 · part
7 Temperature Probe hank-dyeing-machine-temperature-probe 2× 2 · part
8 Pressure Sensor pressure-sensor 1× 1 · part
9 Lid Gasket hank-dyeing-machine-vessel-gasket 1× 1 · part
10 O-Ring Set oring-set 1× 1 · part
11 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the dyeing vessel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks