Heavy Lift Gantry Crane

Product

Overview

A heavy lift gantry crane is a hydraulic lifting system used to raise, lower and move very heavy machinery and structures in places where a conventional crane cannot reach or cannot be set up. It is the standard tool for installing turbines, transformers, presses, vessels and bridge sections inside factories, power stations and refineries, and for loading and unloading heavy modules in confined yards. Instead of a boom, it uses four telescoping legs that stand around the load and raise it straight up on internal hydraulic cylinders, then slide it sideways on low-friction skid shoes.

The appeal of the gantry is that it fits where cranes do not. It can be carried in pieces through a normal doorway, assembled around a machine sitting on a factory floor, and used under a low roof. Capacities run from about 100 t for a compact unit up to 1000 t for the largest systems, and several gantries can be linked to lift even heavier loads in a coordinated operation.

Hydraulic Leg Towers

Each Hydraulic Leg Tower is a telescoping box-section column. A fixed Base Column Section of 700 to 1000 mm square holds a stack of Telescoping Section inner sections that rise in stages, each stage adding 1.5 to 2.5 m of height. The lift is staged because a single cylinder stroke cannot cover the full height: the leg lifts one stroke, a Stage Locking Pin locks the stage mechanically, the cylinder retracts and grips the next stage, and the cycle repeats until the full 6 to 12 m of lift is reached. A Foot Pad under each leg spreads the load so the floor pressure stays below 5 MPa, and a Leg Tilt Sensor reports any out-of-plumb to the controller.

Header Beams and Load Trolley

The legs are linked in pairs by a Header Lifting Beam that spans across the top and carries the load. The Header Box Girder is a welded box girder sized so its midspan deflection stays under 1/600 of the span at full load. The load hangs from Load Attachment Link links rated to 250 t each, or rides on a Load Trolley that traverses the header on Trolley Wheel wheels turning on Ball Bearing bearings, driven by a Trolley Travel Drive motor through a Gearbox Housing and Helical Gear Pair. The trolley lets the operator move the load off the gantry centreline and set it down beside the lifting position, which is how a machine is shifted from a transporter onto its foundation. Each header connects to its legs through a Header Saddle fitted with PTFE pads so the header can skid for fine alignment.

Hydraulic Lift System

The Hydraulic Lift System does the actual raising. Inside each leg is a Main Lift Cylinder with a Cylinder Tube and Rod of 350 to 600 mm bore, rated 2500 to 6000 kN at 350 bar. The Piston and Seal Carrier carries the high-pressure and bearing seals against the bore, and the seal kits use an O-Ring Set together with an Oil Seal rod wiper to keep the chromed rod clean. Two safety features back up the hydraulics: a Mechanical Lock Collar wound onto the extended rod holds the load with no oil pressure at all, and a Counterbalance Lock Valve counterbalance valve on each cylinder prevents any uncontrolled descent if a hose bursts.

Skidding System

Once a load is up, the Skidding System moves it or the whole gantry sideways under full weight. The load sits on PTFE Skid Shoe shoes whose PTFE base runs on a polished stainless Skid Track Beam track at a friction coefficient near 0.05, which means even a 500 t load needs only about 25 t of push to move. A Skid Track Gripper anchors a Skid Push-Pull Cylinder to the track, and the cylinder pushes the load forward 0.5 to 1 m per stroke. Skidding is how heavy modules are walked into position when there is no headroom to lift and carry them.

Track System

For travelling between lift positions the gantry runs on the Rolling Track and Base. Each leg sits on a Travel Bogie with Bogie Wheel wheels on Ball Bearing bearings and an equalising Equalising Bogie Frame that shares load over rail irregularities. The bogies run on Track Rail crane rail spread onto the floor by a Base Distribution Beam where the floor is weak, and a Rail Clamp holds the parked gantry against wind.

Power and Control

The Hydraulic Power Pack feeds every circuit. A Prime Mover, usually a Electric Drive Motor of 75 to 200 kW on electric units, drives Hydraulic Pump pumps delivering 350 bar. The key part is the Synchronisation Manifold, whose Proportional Valve proportional valves meter flow so all four legs rise within a few millimetres of each other, with a System Relief Valve capping pressure at 360 bar. Oil is cleaned by a Hydraulic Filter and cooled by a Air-Blast Oil Cooler during continuous skidding.

The Control and Monitoring System runs on a safety PLC in the PLC Control Cabinet built on Bare PCB boards with an Microcontroller processor and a Power Supply for the 24 V system. It reads a Load Cell on each leg for load sharing and overload protection, and a Cylinder Stroke Sensor measuring cylinder extension to 1 mm so the legs stay level through every stage. The operator works from a Radio Remote Control radio with a Radio Transmitter transmitter that includes a redundant stop channel, so they can stand clear and watch the load throughout the lift.

Bill of materials for Heavy Lift Gantry Crane

7 top-level lines as of r81411
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hydraulic Leg Tower 5 parts heavy-lift-gantry-leg-tower 4× 4 0 assembly
2 Header Lifting Beam 4 parts heavy-lift-gantry-header-beam 2× 2 0 assembly
3 Hydraulic Lift System 4 parts heavy-lift-gantry-lift-system 1× 1 0 assembly
4 Skidding System 4 parts heavy-lift-gantry-skid-system 1× 1 0 assembly
5 Rolling Track and Base 4 parts heavy-lift-gantry-track-system 1× 1 0 assembly
6 Hydraulic Power Pack 6 parts heavy-lift-gantry-power-pack 1× 1 0 assembly
7 Control and Monitoring System 5 parts heavy-lift-gantry-control-system 1× 1 0 assembly

1,029-word article