Propulsion Train
AssemblyA medium-speed main engine through a reduction gearbox to a controllable-pitch propeller, with a bow thruster for low-speed positioning alongside. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Propulsion Train
6 top-level lines as of r81596| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Engine 7 parts | heavy-lift-ship-main-engine | 1× | 1 | 0 | assembly |
| 2 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 3 | Shaft Line 4 parts | heavy-lift-ship-shaft-line | 1× | 1 | 0 | assembly |
| 4 | Controllable-Pitch Propeller 4 parts | heavy-lift-ship-cpp | 1× | 1 | 0 | assembly |
| 5 | Rudder | heavy-lift-ship-rudder | 1× | 1 | · | part |
| 6 | Bow Thruster 5 parts | heavy-lift-ship-thruster | 1× | 1 | 0 | assembly |