Galley
AssemblyCooktop, refrigerator, sink and cabinetry. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Galley parts and their functions
5 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cooktop 3 parts | 1× | Two-burner induction/propane cooktop. |
| 2 | Marine Refrigerator 4 parts | 1× | 12V compressor refrigerator. |
| 3 | Galley Sink | 1× | Stainless undermount sink. |
| 4 | Galley Cabinetry | 1× | Marine plywood cabinets. |
| 5 | Countertop | 1× | Solid-surface counter. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Galley
5 top-level lines · 12 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cooktop 3 parts | houseboat-cooktop | 1× | 1 | 4 | assembly |
| 1.1 | Heating Element | heating-element | 2× | 2 | · | part |
| 1.2 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 1.3 | Ceramic Glass Top | houseboat-glass-top | 1× | 1 | · | part |
| 2 | Marine Refrigerator 4 parts | houseboat-refrigerator | 1× | 1 | 4 | assembly |
| 2.1 | DC Compressor | houseboat-compressor | 1× | 1 | · | part |
| 2.2 | Condenser Coil | houseboat-condenser-coil | 1× | 1 | · | part |
| 2.3 | Evaporator Plate | houseboat-evaporator-plate | 1× | 1 | · | part |
| 2.4 | Fridge Cabinet | houseboat-fridge-cabinet | 1× | 1 | · | part |
| 3 | Galley Sink | houseboat-sink | 1× | 1 | · | part |
| 4 | Galley Cabinetry | houseboat-cabinetry | 1× | 1 | · | part |
| 5 | Countertop | houseboat-countertop | 1× | 1 | · | part |
Where the galley is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |