BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Tube

Assembly

Twin-chamber nylon ripstop construction: outer chamber for display, inner chamber for structural pressure, both heat-sealed and bolted at feet. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Tube parts and their functions

4 top-level parts · 9 parts in total · full bill of materials below
Main Tube parts diagram: 1 sheet metal panel, 2 seam seal, 3 fastener set, 4 wire bundle. 9 parts in 4 top-level items.
Main Tube parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Sheet Metal Panel 3× Nylon ripstop 100–150 micron for outer and inner sleeves
2 Seam Seal 1× Adhesive and thread reinforcement at stress lines
3 Fastener Set 4× Heavy-duty stainless grommets and tie-down points
4 Wire Bundle 1× Nylon reinforcement webbing along arch spine

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Tube

4 top-level lines · 4 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sheet Metal Panel sheet-panel 3× 3 · part
2 Seam Seal inflatable-advertising-arch-seam-seal 1× 1 · part
3 Fastener Set fastener-set 4× 4 · part
4 Wire Bundle wire-bundle 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the main tube is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks