Buoyancy Structure
AssemblyTwo independent stacked buoyancy tubes, an inflatable floor, and a canopy arch, each a separate gas chamber so one puncture cannot sink the raft. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Buoyancy Structure parts and their functions
6 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Upper Buoyancy Tube | 1× | Welded polyurethane-coated nylon tube forming the top ring of the raft, an independent chamber sized to float the full complement alone. |
| 2 | Lower Buoyancy Tube | 1× | Bottom buoyancy ring bonded to the floor; with the upper tube it gives roughly 96 cm of combined freeboard structure. |
| 3 | Inflatable Floor | 1× | Double-skin floor inflated by bellows pump to insulate occupants from cold water conduction. |
| 4 | Canopy Arch Tube | 1× | Self-erecting canopy support |
| 5 | Pressure Relief Valve | 4× | One per chamber |
| 6 | Topping-Up Valve | 4× | One-way valve accepting the bellows pump to restore tube pressure as gas cools or seeps. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Buoyancy Structure
6 top-level lines · 6 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Upper Buoyancy Tube | liferaft-upper-tube | 1× | 1 | · | part |
| 2 | Lower Buoyancy Tube | liferaft-lower-tube | 1× | 1 | · | part |
| 3 | Inflatable Floor | liferaft-inflatable-floor | 1× | 1 | · | part |
| 4 | Canopy Arch Tube | liferaft-arch-tube | 1× | 1 | · | part |
| 5 | Pressure Relief Valve | liferaft-relief-valve | 4× | 4 | · | part |
| 6 | Topping-Up Valve | liferaft-topping-valve | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the buoyancy structure is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |