Cargo Manifold
AssemblyMidship presentation point where the ship's liquid and vapour lines meet the terminal loading arms, with reducers, ESD valves, drip trays and a powered presentation flange. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Manifold parts and their functions
5 top-level parts · 428 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Manifold Spool | 8× | Liquid and vapour manifold spools and reducers |
| 2 | Cryogenic Valve | 12× | Manifold isolation and ESD valves |
| 3 | Drip Tray | 2× | Stainless drip trays under the manifold |
| 4 | Presentation Flange | 6× | ANSI presentation flanges for the loading arms |
| 5 | Flange Bolt Set Item | 400× | Manifold flange bolting |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Manifold
5 top-level lines · 5 rows shown · 428 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Manifold Spool | lng-manifold-spool | 8× | 8 | · | part |
| 2 | Cryogenic Valve | lng-cryo-valve | 12× | 12 | · | part |
| 3 | Drip Tray | lng-drip-tray | 2× | 2 | · | part |
| 4 | Presentation Flange | lng-presentation-flange | 6× | 6 | · | part |
| 5 | Flange Bolt Set Item | lng-flange-bolt | 400× | 400 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cargo manifold is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |