Hull Grand Block
AssemblyOne ~300 t pre-outfitted grand block of the double-hull structure, assembled from plates and stiffeners and joined by thousands of tracked weld seams before dry-dock erection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Hull Grand Block parts and their functions
5 top-level parts · 6,604 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Hull Plate | 60× | Shell, inner hull and deck plates |
| 2 | Hull Stiffener | 274× | Longitudinals and web frames |
| 3 | Structural Bracket | 420× | Brackets, collars, lugs and clips |
| 4 | Weld Seam | 5800× | Weld joints tracked per block in the yard work breakdown |
| 5 | Penetration Piece | 50× | Penetration pieces and doubler plates |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Hull Grand Block
5 top-level lines · 5 rows shown · 6,604 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Hull Plate | lng-shell-plate | 60× | 60 | · | part |
| 2 | Hull Stiffener | lng-stiffener | 274× | 274 | · | part |
| 3 | Structural Bracket | lng-bracket | 420× | 420 | · | part |
| 4 | Weld Seam | lng-weld-seam | 5800× | 5,800 | · | part |
| 5 | Penetration Piece | lng-pipe-penetration | 50× | 50 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the hull grand block is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |