BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Flue Gas Treatment

Assembly

Scrubber and particulate removal system for exhaust gas cleaning. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Flue Gas Treatment parts and their functions

7 top-level parts · 12 parts in total · full bill of materials below
Flue Gas Treatment parts diagram: 1 scrubber chamber, 2 spray nozzle, 3 baghouse filter, 4 fly ash hopper, 5 scrubber pump, 6 drain valve, 7 fastener set. 12 parts in 7 top-level items.
Flue Gas Treatment parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Scrubber Chamber 1× Water spray absorption vessel
2 Spray Nozzle 6× Water atomization headers
3 Baghouse Filter 1× Fabric filter cartridges (8–12 bags)
4 Fly Ash Hopper 1× Collection sump below baghouse
5 Scrubber Pump 1× Seawater circulation pump, 20 L/min
6 Drain Valve 1× Sediment purge to overboard discharge
7 Fastener Set 1× Filter housing bolts and clamps

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Flue Gas Treatment

7 top-level lines · 7 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Scrubber Chamber marine-incinerator-scrubber-chamber 1× 1 · part
2 Spray Nozzle marine-incinerator-spray-nozzles 6× 6 · part
3 Baghouse Filter marine-incinerator-baghouse-filter 1× 1 · part
4 Fly Ash Hopper marine-incinerator-fly-ash-hopper 1× 1 · part
5 Scrubber Pump marine-incinerator-scrubber-pump 1× 1 · part
6 Drain Valve marine-incinerator-drain-valve 1× 1 · part
7 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the flue gas treatment is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks