BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Secondary Settler

Assembly

Gravity clarifier separating biological solids from treated water. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Secondary Settler parts and their functions

7 top-level parts · 7 parts in total · full bill of materials below
Secondary Settler parts diagram: 1 settler basin, 2 settler baffle, 3 lamella pack, 4 sludge rake, 5 return pump, 6 weir outlet, 7 fastener set. 7 parts in 7 top-level items.
Secondary Settler parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Settler Basin 1× Circular or rectangular tank, 10 m³
2 Settler Baffle 1× Inlet distribution ring
3 Lamella Pack 1× Parallel-plate settling assistance
4 Sludge Rake 1× Slow-speed solids collector arm
5 Return Pump 1× Recirculates biomass to aeration
6 Weir Outlet 1× Fixed-crest discharge weir
7 Fastener Set 1× Baffle and rake support hardware

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Secondary Settler

7 top-level lines · 7 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Settler Basin marine-sewage-treatment-settler-basin 1× 1 · part
2 Settler Baffle marine-sewage-treatment-settler-baffle 1× 1 · part
3 Lamella Pack marine-sewage-treatment-settler-lamella-pack 1× 1 · part
4 Sludge Rake marine-sewage-treatment-sludge-rake 1× 1 · part
5 Return Pump marine-sewage-treatment-return-pump 1× 1 · part
6 Weir Outlet marine-sewage-treatment-weir-outlet 1× 1 · part
7 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the secondary settler is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks