BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Water Intake System

Assembly

Seacock, hose, strainer, and pressure-reducing lines supplying fresh or salt water to the pump. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Water Intake System parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Water Intake System parts diagram: 1 seacock, 2 strainer basket, 3 intake hose, 4 hose clamp, 5 pressure gauge. 8 parts in 5 top-level items.
Water Intake System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Seacock 1× Bronze through-hull valve
2 Strainer Basket 1× Intake filter
3 Intake Hose 1× 3/8 in flexible vinyl hose
4 Hose Clamp 4× Stainless hose clamps
5 Pressure Gauge 1× Optional flow indicator

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Water Intake System

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Seacock marine-toilet-seacock 1× 1 · part
2 Strainer Basket marine-toilet-strainer-basket 1× 1 · part
3 Intake Hose marine-toilet-intake-hose 1× 1 · part
4 Hose Clamp marine-toilet-intake-clamp 4× 4 · part
5 Pressure Gauge marine-toilet-pressure-gauge 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the water intake system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks