Station Clamp Arm Sets
AssemblyPneumatic edge-grip arms positioned at each carousel station, holding mattress perimeter rigid during layer bonding. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Station Clamp Arm Sets parts and their functions
4 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Edge Clamp Pneumatic Cylinder | 4× | Double-acting cylinders per station (bore 50 mm) |
| 2 | Soft Clamp Gripper Pad | 1× | Soft foam pads preventing foam crushing |
| 3 | Station Solenoid Control Manifold | 1× | Solenoid directional valve controlling all clamps on current station |
| 4 | Pilot-Operated Pressure Relief | 1× | Pilot-operated relief limiting clamp force |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Station Clamp Arm Sets
4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Edge Clamp Pneumatic Cylinder | mattress-carousel-clamp-cylinder | 4× | 4 | · | part |
| 2 | Soft Clamp Gripper Pad | mattress-carousel-clamp-pad | 1× | 1 | · | part |
| 3 | Station Solenoid Control Manifold | mattress-carousel-clamp-manifold | 1× | 1 | · | part |
| 4 | Pilot-Operated Pressure Relief | mattress-carousel-pressure-relief | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the station clamp arm sets is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |