BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Tape Take-Up

Assembly

Geared roller train that draws the finished tape from the fell at a fixed rate per pick, setting pick density, and delivers it to a coiler or container. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Tape Take-Up parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Tape Take-Up parts diagram: 1 take-up roller, 2 pressure roller, 3 pick change gears, 4 helical gear pair, 5 coil spring. 8 parts in 5 top-level items.
Tape Take-Up parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Take-Up Roller 2× Knurled take-up rollers
2 Pressure Roller 2× Spring-loaded pressure rollers
3 Pick Change Gears 1× Change gear set
4 Helical Gear Pair 1× Take-up drive gears
5 Coil Spring 2× Nip pressure springs

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Tape Take-Up

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Take-Up Roller narrow-fabric-loom-takeup-roller 2× 2 · part
2 Pressure Roller narrow-fabric-loom-pressure-roller 2× 2 · part
3 Pick Change Gears narrow-fabric-loom-pick-gears 1× 1 · part
4 Helical Gear Pair gear-pair 1× 1 · part
5 Coil Spring coil-spring 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the tape take-up is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks