Interior Fitout
AssemblyGalley, berth, seating, joinery and flooring. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Interior Fitout parts and their functions
7 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Galley Units | 1× | Fitted galley cabinets and worktop. |
| 2 | Gas Cooker 3 parts | 1× | LPG oven and hob. |
| 3 | Compressor Fridge | 1× | 12V compressor refrigerator. |
| 4 | Berth | 1× | Fixed or convertible bed. |
| 5 | Saloon Seating | 1× | Upholstered saloon seating. |
| 6 | Cabin Joinery | 1× | Hardwood-faced ply cabinetry and lining. |
| 7 | Flooring | 1× | Engineered timber cabin floor. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Interior Fitout
7 top-level lines · 10 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Galley Units | narrowboat-galley-units | 1× | 1 | · | part |
| 2 | Gas Cooker 3 parts | narrowboat-cooker | 1× | 1 | 6 | assembly |
| 2.1 | Heating Element | heating-element | 1× | 1 | · | part |
| 2.2 | Gas Burner Valve | narrowboat-gas-valve | 4× | 4 | · | part |
| 2.3 | Hob Grate | narrowboat-hob-grate | 1× | 1 | · | part |
| 3 | Compressor Fridge | narrowboat-fridge | 1× | 1 | · | part |
| 4 | Berth | narrowboat-berth | 1× | 1 | · | part |
| 5 | Saloon Seating | narrowboat-seating | 1× | 1 | · | part |
| 6 | Cabin Joinery | narrowboat-joinery | 1× | 1 | · | part |
| 7 | Flooring | narrowboat-flooring | 1× | 1 | · | part |
Where the interior fitout is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |